Perfect World
Hydrology Metering

Folsom Dam · American River · CA

Folsom Lake

Sacramento's flood shield and water supply in one structure — it swings between full and drained faster than any big CVP reservoir.

Water surface elevation

411.4 ft

Bureau of Reclamation, daily · daily value, Sep 1

Water in storage

460,470 acre-feet

Bureau of Reclamation, daily · daily value, Sep 1

Share of capacity

47.1% full

against the project figure capacity figure (USBR Central Valley Project data)

Below full pool

54.6 ft

full pool at 466.0 ft

This month in the record

lower than 68% of the 69 Septembers on record

monthly mean storage; record low 156,287 acre-feet (1977), record high 846,583 acre-feet (1969)

30-day trend

-6,087 af/day

storage, 2026-07-312026-08-30; over the year -29.4 af/day. Measured change, not a forecast.

Drought at the dam

D0 — Abnormally dry

US Drought Monitor at the dam's coordinates, released 2026-08-27; the feeding basin can differ.

full pool 466 ftcolumn continues below411

47.1% full

of capacity, by storage (project figure figure, USBR Central Valley Project data). Sedimentation slowly shrinks real capacity.

The water line is elevation (USBR project datum); the percentage is storage ÷ capacity. They are different measures — a reservoir's volume is not linear in its depth, so the line's height in this column is not the percentage.

The last 120 days

Daily water-surface elevation in feet. The axis hugs the data — it does not start at zero. Source: committed snapshot (USBR RISE, retrieved 2026-08-31).

405.9438.3470.7May 2Jul 2Aug 30412.1
See the numbers as a table
DateElevation (ft)
Aug 30412.13
Aug 29412.41
Aug 28412.68
Aug 27412.87
Aug 26413.24
Aug 25413.78
Aug 24414.23
Aug 23414.74
Aug 22415.29
Aug 21415.89
Aug 20416.61
Aug 19417.47
Aug 18418.29
Aug 17419.09
Aug 16419.97
Aug 15420.82
Aug 14421.61
Aug 13422.53
Aug 12423.48
Aug 11424.40
Aug 10425.38
Aug 9426.31
Aug 8427.17
Aug 7427.97
Aug 6428.78
Aug 5429.54
Aug 4430.42
Aug 3431.23
Aug 2432.12
Aug 1433.02

Most recent 30 days shown.

The whole record

Monthly mean elevation, Mar 1955 to Aug 2026. The axis spans the pools, not zero; elevations in USBR project datum. Months with fewer than 15 gaged days are dropped, and gaps in the record break the line. Source: USBR RISE, retrieved 2026-08-31.

monthly mean elevationpool reference lines
252365478Mar 1955Jan 1991Aug 2026full pool421
See the numbers as a table
MonthMean elevation (ft)Days gaged
Aug 2026421.130
Jul 2026445.031
Jun 2026461.529
May 2026463.631
Apr 2026458.130
Mar 2026445.331
Feb 2026423.127
Jan 2026426.631
Dec 2025414.131
Nov 2025407.430
Oct 2025407.931
Sep 2025411.330
Aug 2025417.131
Jul 2025439.031
Jun 2025457.430
May 2025460.831
Apr 2025458.930
Mar 2025436.831
Feb 2025426.028
Jan 2025397.831
Dec 2024389.531
Nov 2024396.830
Oct 2024407.531
Sep 2024413.830

Most recent 24 months shown; the full monthly series is in the page's API response.

Storage against capacity

Monthly mean storage in acre-feet, zero baseline. The dashed line is the project figure capacity figure (USBR Central Valley Project data) — sedimentation slowly shrinks real capacity. Storage can legitimately rise past a conservation-pool line when the flood pool is in use.

monthly mean storagecapacity
0529,6811.1MMar 1955Dec 1991Aug 2026capacity538,849
See the numbers as a table
MonthMean storage (acre-feet)Days gaged
Aug 2026538,84930
Jul 2026756,09231
Jun 2026926,96029
May 2026949,93731
Apr 2026891,15230
Mar 2026758,64131
Feb 2026554,72727
Jan 2026584,06331
Dec 2025481,27431
Nov 2025430,66830
Oct 2025434,16831
Sep 2025459,60730
Aug 2025505,31831
Jul 2025699,18231
Jun 2025882,58630
May 2025919,12331
Apr 2025898,94930
Mar 2025677,19031
Feb 2025584,01428
Jan 2025364,97031
Dec 2024313,71131
Nov 2024359,15730
Oct 2024431,45231
Sep 2024479,03230

Most recent 24 months shown.

Where these numbers come from

Readings at Folsom Lake are the measuring agencies' own: each value above names its source (USGS gage, Bureau of Reclamation daily record, Army Corps project data, or this desk's committed copy) and its observation time in the reservoir's own time zone. The capacity figure is the project figure USBR Central Valley Project data number; sedimentation slowly shrinks real capacity, so the vintage travels with the percent.