Water surface elevation

508.5 ft

Bureau of Reclamation, daily · daily value, Aug 31

Water in storage

241,469 acre-feet

Bureau of Reclamation, daily · daily value, Aug 31

Share of capacity

46.4% full

against the project figure capacity figure (USBR Friant Division project data)

Below full pool

69.5 ft

full pool at 578.0 ft

This month in the record

lower than 32% of the 82 Septembers on record

monthly mean storage; record low 93,587 acre-feet (1950), record high 438,480 acre-feet (1998)

30-day trend

-1,373 af/day

storage, 2026-07-312026-08-30; over the year -5.6 af/day. Measured change, not a forecast.

Drought at the dam

D0 — Abnormally dry

US Drought Monitor at the dam's coordinates, released 2026-08-27; the feeding basin can differ.

full pool 578 ftcolumn continues below508

46.4% full

of capacity, by storage (project figure figure, USBR Friant Division project data). Sedimentation slowly shrinks real capacity.

The water line is elevation (USBR project datum); the percentage is storage ÷ capacity. They are different measures — a reservoir's volume is not linear in its depth, so the line's height in this column is not the percentage.

The last 120 days

Daily water-surface elevation in feet. The axis hugs the data — it does not start at zero. Source: committed snapshot (USBR RISE, retrieved 2026-08-31).

499.9541.0582.2May 1Jul 1Aug 30508.8
See the numbers as a table
DateElevation (ft)
Aug 30508.77
Aug 29508.83
Aug 28508.67
Aug 27507.92
Aug 26507.86
Aug 25508.33
Aug 24508.82
Aug 23508.98
Aug 22509.42
Aug 21509.47
Aug 20509.80
Aug 19510.56
Aug 18511.54
Aug 17512.59
Aug 16513.30
Aug 15513.88
Aug 14514.56
Aug 13515.47
Aug 12516.41
Aug 11517.19
Aug 10517.66
Aug 9517.95
Aug 8518.08
Aug 7518.15
Aug 6518.40
Aug 5518.86
Aug 4519.20
Aug 3519.43
Aug 2520.06
Aug 1520.66

Most recent 30 days shown.

The whole record

Monthly mean elevation, Mar 1944 to Aug 2026. The axis spans the pools, not zero; elevations in USBR project datum. Months with fewer than 15 gaged days are dropped, and gaps in the record break the line. Source: USBR RISE, retrieved 2026-08-31.

monthly mean elevationpool reference lines
398493588Mar 1944Jun 1985Aug 2026full pool514
See the numbers as a table
MonthMean elevation (ft)Days gaged
Aug 2026513.730
Jul 2026538.930
Jun 2026570.829
May 2026571.531
Apr 2026560.630
Mar 2026551.031
Feb 2026534.627
Jan 2026544.431
Dec 2025534.231
Nov 2025516.930
Oct 2025511.731
Sep 2025509.930
Aug 2025517.331
Jul 2025544.031
Jun 2025570.030
May 2025563.931
Apr 2025549.030
Mar 2025530.831
Feb 2025516.528
Jan 2025506.531
Dec 2024499.931
Nov 2024497.730
Oct 2024504.031
Sep 2024513.030

Most recent 24 months shown; the full monthly series is in the page's API response.

Storage against capacity

Monthly mean storage in acre-feet, zero baseline. The dashed line is the project figure capacity figure (USBR Friant Division project data) — sedimentation slowly shrinks real capacity. Storage can legitimately rise past a conservation-pool line when the flood pool is in use.

monthly mean storagecapacity
0273,263546,525Mar 1944Jun 1985Aug 2026capacity258,451
See the numbers as a table
MonthMean storage (acre-feet)Days gaged
Aug 2026258,45130
Jul 2026349,90630
Jun 2026486,25929
May 2026489,49331
Apr 2026439,44730
Mar 2026397,64831
Feb 2026332,26527
Jan 2026370,88931
Dec 2025330,81431
Nov 2025269,22930
Oct 2025251,83331
Sep 2025246,13330
Aug 2025270,59931
Jul 2025370,07831
Jun 2025482,24430
May 2025453,97931
Apr 2025389,60730
Mar 2025318,31431
Feb 2025267,84228
Jan 2025235,46431
Dec 2024215,29831
Nov 2024208,98830
Oct 2024227,67831
Sep 2024256,11430

Most recent 24 months shown.

Where these numbers come from

Readings at Millerton Lake are the measuring agencies' own: each value above names its source (USGS gage, Bureau of Reclamation daily record, Army Corps project data, or this desk's committed copy) and its observation time in the reservoir's own time zone. The capacity figure is the project figure USBR Friant Division project data number; sedimentation slowly shrinks real capacity, so the vintage travels with the percent.