Perfect World
Hydrology Metering

Navajo Dam · San Juan River · NM–CO

Navajo Reservoir

The San Juan basin's storage, feeding the Navajo Indian Irrigation Project and the San Juan-Chama diversion into the Rio Grande.

Water surface elevation

6,013.2 ft

Bureau of Reclamation, daily · daily value, Aug 31

Water in storage

806,933 acre-feet

Bureau of Reclamation, daily · daily value, Aug 31

Share of capacity

47.2% full

against the project figure capacity figure (USBR Navajo Dam project data)

Below full pool

71.8 ft

full pool at 6,085.0 ft

This month in the record

lower than 89% of the 64 Septembers on record

monthly mean storage; record low 20,431 acre-feet (1962), record high 1.65 million acre-feet (1984)

30-day trend

-2,775 af/day

storage, 2026-07-312026-08-30; over the year -270 af/day. Measured change, not a forecast.

Drought at the dam

D3 — Extreme drought

US Drought Monitor at the dam's coordinates, released 2026-08-27; the feeding basin can differ.

full pool 6,085 ftcolumn continues below6,013

47.2% full

of capacity, by storage (project figure figure, USBR Navajo Dam project data). Sedimentation slowly shrinks real capacity.

The water line is elevation (USBR project datum); the percentage is storage ÷ capacity. They are different measures — a reservoir's volume is not linear in its depth, so the line's height in this column is not the percentage.

Snowpack in the feeding basin

Measured across the San Juan headwaters.

Snow season

typically Oct 22 – Jun 2

0 in on the ground, 2026-09-01; median peak 24 in around Apr 29

Last winter's verdict

46% of median peak

water year 2026 — the snow that fed this year's pool

5 highest active SNOTEL stations in the basin (Stump Lakes, Red Mountain Pass, Wolf Creek Summit, …), NRCS AWDB REST (SNOTEL), station set pinned 2026-08-31. Daily snow-water equivalent against the stations' own 30-year medians; off season the percent is withheld rather than divided by zero.

The last 120 days

Daily water-surface elevation in feet. The axis hugs the data — it does not start at zero. Source: committed snapshot (USBR RISE, retrieved 2026-08-31).

6010.66025.26039.9May 3Jul 2Aug 306013.4
See the numbers as a table
DateElevation (ft)
Aug 306013.41
Aug 296013.72
Aug 286014.08
Aug 276014.36
Aug 266014.70
Aug 256015.01
Aug 246015.35
Aug 236015.67
Aug 226016.00
Aug 216016.30
Aug 206016.66
Aug 196017.02
Aug 186017.39
Aug 176017.74
Aug 166018.06
Aug 156018.39
Aug 146018.73
Aug 136019.04
Aug 126019.44
Aug 116019.73
Aug 106020.08
Aug 96020.41
Aug 86020.71
Aug 76021.04
Aug 66021.53
Aug 56021.84
Aug 46021.88
Aug 36022.14
Aug 26022.39
Aug 16022.63

Most recent 30 days shown.

The whole record

Monthly mean elevation, Jul 1962 to Aug 2026. The axis spans the pools, not zero; elevations in USBR project datum. Months with fewer than 15 gaged days are dropped, and gaps in the record break the line. Source: USBR RISE, retrieved 2026-08-31.

monthly mean elevationpool reference lines
5,7845,9436,102Jul 1962Aug 1994Aug 2026full pool6,018
See the numbers as a table
MonthMean elevation (ft)Days gaged
Aug 20266018.230
Jul 20266026.631
Jun 20266034.030
May 20266036.731
Apr 20266036.830
Mar 20266033.831
Feb 20266032.928
Jan 20266033.531
Dec 20256033.231
Nov 20256033.330
Oct 20256027.631
Sep 20256022.530
Aug 20256028.331
Jul 20256036.731
Jun 20256041.230
May 20256038.831
Apr 20256036.730
Mar 20256036.431
Feb 20256037.328
Jan 20256038.531
Dec 20246039.631
Nov 20246040.930
Oct 20246041.431
Sep 20246043.930

Most recent 24 months shown; the full monthly series is in the page's API response.

Storage against capacity

Monthly mean storage in acre-feet, zero baseline. The dashed line is the project figure capacity figure (USBR Navajo Dam project data) — sedimentation slowly shrinks real capacity. Storage can legitimately rise past a conservation-pool line when the flood pool is in use.

monthly mean storagecapacity
0897,0151.8MJul 1962Aug 1994Aug 2026capacity850,398
See the numbers as a table
MonthMean storage (acre-feet)Days gaged
Aug 2026850,39830
Jul 2026927,20331
Jun 2026999,37230
May 20261,026,04831
Apr 20261,027,22330
Mar 2026997,06131
Feb 2026988,54928
Jan 2026993,70531
Dec 2025991,24831
Nov 2025991,92030
Oct 2025938,03131
Sep 2025888,71230
Aug 2025943,25831
Jul 20251,026,86531
Jun 20251,073,53130
May 20251,047,54631
Apr 20251,026,26830
Mar 20251,023,48531
Feb 20251,032,47428
Jan 20251,045,25831
Dec 20241,056,57731
Nov 20241,070,18830
Oct 20241,075,54531
Sep 20241,102,72630

Most recent 24 months shown.

Where these numbers come from

Readings at Navajo Reservoir are the measuring agencies' own: each value above names its source (USGS gage, Bureau of Reclamation daily record, Army Corps project data, or this desk's committed copy) and its observation time in the reservoir's own time zone. The capacity figure is the project figure USBR Navajo Dam project data number; sedimentation slowly shrinks real capacity, so the vintage travels with the percent.